Unit cost

Line capacity with OEE and bottleneck, unit cost by line item with the origin of each value, break-even, sensitivity and comparison with buying.

Preliminary estimate, not a contractual budget

Each value shows where it comes from: supplier quote, published price, historical estimate, index or own assumption. Only a firm, valid quote commits a price.
Cargando…

Calculation version:industrial-cost@1.0.0.

How to use it

  1. 1Describe the process by stages: rate per machine and number of machines. The slowest sets the line's capacity.
  2. 2Enter shifts, days, stops and the OEE (availability, performance and quality), and the annual demand.
  3. 3Add materials with their scrap, labour, energy, equipment and other costs, and mark where each value comes from: quote, published price, historical estimate, index or assumption.
  4. 4If you're weighing make versus buy, turn on the comparison with the supplier's price.

How it calculates

  • Planned hours = hours per shift × shifts × days × (1 − planned stops). OEE = availability × performance × quality.
  • Capacity of each stage = rate × machines × planned hours × OEE; the line's is that of the slowest stage (bottleneck).
  • Material per unit = quantity / (1 − scrap) × price. Labour = minutes / 60 × cost per hour.
  • Depreciation = investment × (1 − residual) / service life; maintenance = % of the investment per year; both and the fixed costs are spread over the volume.
  • Unit cost = direct costs × (1 + overheads) × (1 + contingency). Break-even = fixed costs with mark-ups / (price − variable with mark-ups).
  • Make or buy: the purchase price (with extras and management) is compared with the variable cost of making plus the share of fixed costs that would disappear.

See the full methodology →

Verifiable example

With the tool's fictitious example (three stages, two 8-hour shifts, 220 days, 83.79% OEE), the line can make 238,902 units a year and painting is the bottleneck; with a demand of 200,000 it's at 83.7%. The unit cost comes to €10.55 and, selling at €15, break-even is 25,527 units. Buying at €11 plus 10% extras and €20,000 of management costs €12.20 per unit, against a relevant making cost of €10.22: with this data, making is €1.98 cheaper, and would be from 20,491 units a year.

Limitations

  • It's a preliminary estimate, not a contractual budget or an offer.
  • It models a serial line for a single product: it doesn't allocate costs between several products or account for inventories or changeover times.
  • Make or buy only compares costs: it doesn't include quality, lead times, supplier dependence or what you'd do with the freed-up capacity.

What the paid levels will add

Compare the levels →
  • Pro· soon

    Cloud cost models

    Your cost breakdowns and budgets saved with versions.

    Coming in the Pro level · Coming soon

    Cloud projects, more capacity and reports without watermark.

    Designed for: People starting a business and less specialised companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Advanced· soon

    Imported bill of materials (BOM)

    Import your BOM and recalculate cost when prices change.

    Coming in the Advanced level · Coming soon

    Each module's professional engines, alerts, scheduled updates and reports with methodology.

    Designed for: Startups and growing companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Advanced· soon

    Process Cost Simulator

    Vary cycle time, yield, scrap, capacity, utilisation, shifts and energy.

    Coming in the Advanced level · Coming soon

    Each module's professional engines, alerts, scheduled updates and reports with methodology.

    Designed for: Startups and growing companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Master· soon

    Process and supplier optimisation

    The lowest-cost combination of batches, shifts and suppliers.

    Coming in the Master level · Coming soon

    Everything without practical limits: optimisation, Monte Carlo simulation, AI with your projects' context, API and licensed data.

    Designed for: Large companies, specialist consultancies and universities

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels