Capital budget

Preliminary budget by line item with minimum, most likely and maximum, P10–P90 range, contingency and quotes with their validity.

Preliminary estimate, not a contractual budget

Each value shows where it comes from: supplier quote, published price, historical estimate, index or own assumption. Only a firm, valid quote commits a price.
Cargando…

Calculation version:industrial-budget@1.0.0.

How to use it

  1. 1Add each item with its minimum, most likely and maximum amount, and where the value comes from.
  2. 2For quotes, enter the supplier, the date and the validity; you can import them as CSV.
  3. 3Check the P10–P90 range, the items with the most uncertainty and what share is backed by valid quotes.

How it calculates

  • Mean of each item (PERT) = (minimum + 4 × most likely + maximum) / 6; deviation = (maximum − minimum) / 6.
  • Sum of independent items: total deviation = √Σ deviation²; P10 and P90 = mean ∓ 1.2816 × deviation (normal approximation).
  • Contingency = % of the sum of the most likely values. A quote whose validity has expired no longer counts as quoted.

See the full methodology →

Verifiable example

With the fictitious example (seven items), the most likely total is €531,000, which rises to €584,100 with 10% contingency. The P10–P90 range goes from €514,603 to €567,397, and the sum of minimums and maximums from €435,000 to €687,000.

Limitations

  • A preliminary budget isn't contractual: the final amount is set by firm offers.
  • It assumes independent items; if they tend to move together (inflation, lead times), the real range is wider.
  • It doesn't include taxes or financing.

What the paid levels will add

Compare the levels →
  • Pro· soon

    Cloud cost models

    Your cost breakdowns and budgets saved with versions.

    Coming in the Pro level · Coming soon

    Cloud projects, more capacity and reports without watermark.

    Designed for: People starting a business and less specialised companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Advanced· soon

    Imported bill of materials (BOM)

    Import your BOM and recalculate cost when prices change.

    Coming in the Advanced level · Coming soon

    Each module's professional engines, alerts, scheduled updates and reports with methodology.

    Designed for: Startups and growing companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Advanced· soon

    Process Cost Simulator

    Vary cycle time, yield, scrap, capacity, utilisation, shifts and energy.

    Coming in the Advanced level · Coming soon

    Each module's professional engines, alerts, scheduled updates and reports with methodology.

    Designed for: Startups and growing companies

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels
  • Master· soon

    Process and supplier optimisation

    The lowest-cost combination of batches, shifts and suppliers.

    Coming in the Master level · Coming soon

    Everything without practical limits: optimisation, Monte Carlo simulation, AI with your projects' context, API and licensed data.

    Designed for: Large companies, specialist consultancies and universities

    Only the Basic level exists today, and it is free. The other levels can't be bought yet and have no published price; this is the current plan and may change.

    Compare the levels